3.
tighten the
⁄
" lag bolts into the mounting
1
2
locations so they do not project more than
⁄
" from the mounting board to the top of the
1
2
head, but leave them out enough to slide the
housing over. this will prepare the mounting
board for the mounting instructions described
in assembly on Page 17.
Note: Predrill the mounting holes now, and
insert the lag screws when you mount the
motor/blower housing in the next section.
top row Mounting hole height
wall stud Centers
figure 10. Board fastened to wall and ready for
motor/blower housing assembly.
-16-
Materials Needed for Concrete/
Masonry Wall
•
Concrete anchor studs
•
hex nuts
⁄
" ............................................... 6
1
2
•
Flat washers
⁄
" ......................................... 6
1
2
•
hammer drill .............................................. 1
•
Masonry drill Bit
⁄
1
•
level 4' ....................................................... 1
•
pencil .......................................................... 1
•
Measuring tape .......................................... 1
To mount the motor/impeller housing to a con-
crete or masonry wall:
1.
Copy the mounting hole layout pattern from
the motor housing to your wall, making sure
the Top Row Mounting Hole Height (see
figure 9 on Page 17) is correct for your dust
collector.
2.
Mount the anchor studs to the wall in the
mounting hole locations for the motor/impel-
ler housing. this will prepare the mounting
board for the mounting instructions described
in assembly on Page 17.
Model g0443 (Mfg. since 11/09)
⁄
" x 2
⁄
" .............. 6
1
3
2
4
" ................................... 1
2