Download Print this page
smith&nephew RENASYS EDGE Installing

smith&nephew RENASYS EDGE Installing

Negative pressure wound therapy system

Advertisement

Quick Links

The RENASYS
EDGE System
Quick reference guide
smith-nephew.com/renasysedge

Advertisement

loading

Summary of Contents for smith&nephew RENASYS EDGE

  • Page 1 The RENASYS EDGE System ◊ Quick reference guide smith-nephew.com/renasysedge...
  • Page 2 The RENASYS EDGE System ◊ Carry handle Therapy screen Play/pause button OK Green LED Alarm and battery Mute alarm button warning LEDs Recessed lock/ unlock button NFC sensor linked to online resources Multifunctional buttons Canister Power button release button Disposable canister 1 RENASYS ◊...
  • Page 3 Power on the device and start therapy When the pump is working correctly Press the button the OK light to start/pause will illuminate the therapy Progressing to target pressure. Cancel Slower Faster Progressing to target pressure. Faster Cancel Target pressure achieved. Select the prescribed negative pressure level using the + or –...
  • Page 4 Installing a new canister Ensure therapy is paused Remove the paper tape around Position the canister so that the or the pump is Off the canister tubing and release tubing tubing is facing to the rear of the pump to full length then align the pump over the canister Push down on the pump until you hear Remove the caps from both quick click Start therapy by pressing...
  • Page 5 RENASYS -F Foam and -G Gauze Dressing Kit ◊ with Soft Port application Clean and debride If dressing wound with foam... Debride any devitalized Cut foam dressing to fit the size and shape of the wound or necrotic eschar tissue. and place cut foam into the wound. Avoid over packing. Foam should completely fill the wound cavity.
  • Page 6 If dressing wound with gauze... While holding the transparent film, expose one side of the adhesive backing Apply a layer of saline moistened by removing a single panel, and apply over gauze to wound bed. Unfold the wound. remaining saline-moistened gauze Cover wound filler with transparent film, and loosely fill the entire wound removing remaining adhesive panels...
  • Page 7 Remove the adhesive backing panel from the RENASYS Soft Port dressing, and align directly over the hole in the transparent film. Use gentle pressure to anchor the Soft Port to the transparent film. Smooth the dressing down while removing the RENASYS Soft Port stabilisation frame. Secure the RENASYS Soft Port to the patient according to your institutional protocol.
  • Page 8 Alerts Alarms Icons and symbol glossary Therapy screen icons Pump buttons Play/Pause Y-Connector Mode Mute Intermitent Mode Canister Release Continuous Mode Therapy paused too long Blockage Canister full Status bar icons Recessed Lock/Unlock Three Multifunction Paused Pump lights System OK System OK Alarm/Alert Low battery...