Miller 22A Owner's Manual page 39

Hide thumbs Also See for 22A:
Table of Contents

Advertisement

Tools Needed:
1
Meter Circuit Board
2
DIP Switch S2
3
Potentiometer R18
4
Receptacle
RC1 6
Wiring
harness with
free-hanging
plug
PLG42
connects to
RC16.
For
voltage
feedback from
voltage
sensing
lead,
connect
plug
PLG43
from
unit
wiring
harness
to
PLG42.
For
voltage
feedback from
welding
power
source
to
wire feeder
14-pin
receptacle,
connect
plug
PLG41
from unit
wiring
harness
to
PLG42.
c:::::::z1=tI
1/4
in
~Tflfl1
O~AR
I
~at
~A.1 PA ~AA
3-8.
Optional
Meter Circuit Board
Settings
X Means switch
position
does
not
affect
specified
function.
I
Means switch must be in this
position.
2
Voltage Sensing
Function
Arc
Voltage Sensing Using Voltage Sensing
Lead For
Welding
Power Source That Does
Not
Support
Pins F And H
Meters/Minute
N/N/IV
VV\IAII
Arc
Voltage Sensing Using
Feedback
From
Welding
Power Source That Does
Support
Pins F And H
Or
Inches/Minute
OM-186 895
Page
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

24a

Table of Contents