GLAZING VISION GV Standard Pyramid Installation Instructions Manual

Advertisement

GV Standard Pyramid
Installation Instruction Manual
"Technical experts in the design, manufacture and supply of precision engineered,
architectural rooflights for residential and commercial buildings."

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GV Standard Pyramid and is the answer not in the manual?

Questions and answers

Summary of Contents for GLAZING VISION GV Standard Pyramid

  • Page 1 GV Standard Pyramid Installation Instruction Manual “Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.”...
  • Page 2 1. The Pyramid should arrive on site in undamaged packaging, which includes sterling board side protection, polyfoam glass protection and low-tack tape base protection. Please inspect for damage to packaging and/or rooflight and advise Glazing Vision upon receipt. 2. Enclosed within the box containing this manual is a roll of butyl tape, the required number of fixing woodscrews and a number of horseshoe packers.
  • Page 3 The construction of the kerb is detailed more specifically on standard drawing 404- ASS-402. 7. Before starting installation, Glazing Vision advises that the physical kerb dimensions are cross-checked with those given for the order, to ensure the rooflight will fit (refer to drawings S0009/10).
  • Page 4 Page 4 of 8 Installation Procedure: Fixed 1. Place two runs of butyl tape around the base of the Pyramid as shown in Figure 1 and place the Pyramid onto your kerb ensuring that it is centred, i.e. drip flashing overhanging equally round all sides.
  • Page 5 Care should be taken when tightening the fixings to ensure the frame does not distort. Figure 3 – Packing and fixing 3. After applying all fixings clip on the covers around the base perimeter. 4. For connecting the Pyramid downlighter, please refer to Glazing Vision’s standard drawing 404-ASS-426.
  • Page 6 Page 6 of 8 Installation Procedure: Opening 1. Before removing the packaging if possible turn the vent on to its side and apply 2 Figure 4 continuous beads of butyl tape to the base of the Pyramid as shown in .
  • Page 7 Kerb structure with cable entry hole refer to drawing 404-ASS-414 for dimensioning details. Kerb not supplied by Glazing Vision Figure 6- Position of power and control cables in motor housing 3. Carefully lower the rooflight onto the kerb top ensuring that cables are not trapped i.e.
  • Page 8 When you are ready to run the Pyramid press and hold the operating switch in the open direction. If the mechanisms do not function as expected within a few seconds release the switch and contact Glazing Vision for assistance.