1. Detachment
exchanger
1) Recover the refrigerant gas.
2) Carry out work of item 1 of !.
3) Remove refrigerant pipe at indoor unit
4) Remove the fixing screws and the
5) Remove the drain hose from the drain
6) While pushing the heat exchanger,
2. Attachment
1) Mount the heat exchanger with the
2) Fix the parts as before in order of drain
3) Connect the refrigerant pipe as before
4) Following to work of item 2 of !,
Procedure
side.
remove the piping cover. (Ø4 × 10,
3 pcs.)
pump and remove the fixing screws t
remove the drain pump stand.(Ø4 × 8,
3 pcs.)
remove the fixing band, fixing scre
and the heat exchanger. (Ø4 × 8,
3 pcs.)
fixing band and the fixing screw
(Ø4 × 8, 3 pcs.)
pump stand → piping cover.
and then apply vacuuming.
attach the parts as before.
Fixing band
Heat exchanger
Fixing screws (Ø4 × 10)
Fixing screws (Ø4 ×10)
Drain pump stand
Drain pump stand
Fixing screws
(Ø4 × 10)
Fixing band
Fixing band
- 99 -
Remarks
Piping cover
Fixing screws
Fixing screws
(Ø4 × 10)
(Ø4 ×1 1 0 0 ))
Fixing screw
Fixing screw