Page 1
ASSEMBLY INSTRUCTIONS YSS-V 1 10X12 FT HARDTOP GAZEBO...
Page 2
ASSEMBLY INSTRUCTIONS 1. Two or more people are required for assembly. 2. A ladder and electric drill may be necessary. 3. Do not erect the structure in heavy winds or inclement weather. 4. Do not leave up this unit for extended periods of time, as it is not a permanent structure or designed to withstand sustained wind or rain.
Page 7
ASSEMBLY INSTRUCTIONS 2pcs 2pcs 2pcs 2pcs 4pcs 42pcs When connecting B and B1 via P, and connecting C and C1 via P, make sure that 3 holes on part P (as shown in the picture) should be facing upwards. Do not install it upside down.
Page 12
ASSEMBLY INSTRUCTIONS 104pcs When sliding 7 x hook U onto each rail of parts C and C1, they should face inward. The same for sliding 6 x hook U on rails of parts B and B1. U U U...
Page 19
ASSEMBLY INSTRUCTIONS 2pcs 4pcs 4pcs Before installing Parts S/S1/S2 , remove protective films (with side marks) on both the front and back sides. After removal , there will be no mark and minimal difference between the sides. Therefore , pay close attention to directions before removal.
Page 24
ASSEMBLY INSTRUCTIONS 4pcs 4pcs Parts R1 and R2 should be installed above Parts Q1 and Q2 , respectively.
Page 25
ASSEMBLY INSTRUCTIONS 20pcs Exterior view R1 R2 Interior view Part Y should be snapped onto the overlapping margin between Part R1/R2/R and Part Q1/Q2/Q.
Page 26
ASSEMBLY INSTRUCTIONS 4pcs The other part has 7 holes hanging on Part C1. The other part One part of the has 7 holes curtain has 6 holes hanging on Part C. hanging on Part B1. One part of the curtain has 6 holes hanging on Part B.
Page 27
ASSEMBLY INSTRUCTIONS Pay attention to the sidewall curtain's installation position.
Page 28
ASSEMBLY INSTRUCTIONS 4pcs+1pc The other part has 7 holes One part of the hanging on Part C1. netting has 6 holes hanging on Part B1. One part of the The other part netting has 6 holes has 7 holes hanging on Part B. hanging on Part C.
Page 29
ASSEMBLY INSTRUCTIONS Pay attention to the mesh Hang the hook attached to netting's installation position. the netting on Part A.
Page 30
ASSEMBLY INSTRUCTIONS 12pcs 12pcs To improve wind resistance, be sure to complete this installation step. If expansion screws or ground nails are not installed,strong winds may topple the gazebo. Cement surfaces Expansion screws are essential for stability on cement surfaces, and ground nails are for grassy surfaces.