mTripod
Installation and mounting
7.4.2
Requirements empty conduits
Note the following points for the empty conduits:
›
Lay empty conduits according to the foundation plan.
›
Conduits have to be planned to a sufficient length.
›
Plan the empty conduits required for access control-devices and other
peripheral equipment. The wiring for this is the responsibility of the
customer.
7.4.3
Building foundation and laying empty conduits
1.
Excavate the foundation hole according to the foundation and empty
conduit plan.
ä Page 35, Fig. 6. ä Page 36, Fig. 7.
2.
When installing outdoors, lay the reinforcement mesh.
3.
Place empty conduits according to the foundation and empty conduit plan
in the foundation hole.
4.
Seal empty conduits so that no water can enter.
5.
Concrete the foundation.
6.
Create a smooth plaster.
7.
Let concrete cure.
8.
Apply moisture protection for outdoor mounting.
34
IMPORTANT!
To ensure trouble-free operation, separate empty conduits must
be installed for all mains cables and control lines.
Need help?
Do you have a question about the MHTM FlowMotion mTripod-ML and is the answer not in the manual?
Questions and answers