Motor terminals
Each terminal is intended for 24 V DC and max 10 A.
Control unit KFC 210 (10 A)
In this example, only motor terminal 1 is active.
Max 4 smoke ventilation windows
GGL/GGU -K-- ----40
or
1 smoke ventilation window CSP can be con-
nected to the control unit.
Control unit KFC 220 (2 x 10 A)
In this example, both motor terminals 1 and 2 are
active.
Max 8 smoke ventilation windows
GGL/GGU -K-- ----40 (max 4 windows per motor
terminal)
or
2 smoke ventilation windows CSP can be con-
nected to the control unit.
Terminal module
To ensure cable monitoring, the terminal module
in the control unit must be moved to the last con-
nection between smoke ventilation windows
GGL/GGU -K-- ----40 or CSP and the cables from
the control unit.
NB: In case motors operate in the wrong direc-
tion, transpose the two motor cables in the
terminal.
14 VELUX
®
230V/50Hz
MOTOR 1
MOTOR 2
ALARM
LINK
RAIN OUT
RAIN IN
FACU
ERROR
SMOKE
RAIN
COMFORT
BREAK GLASS POINT
L
N
PE
1
2
3
4
5
1
2
1
2
3
1
2
3
+ –
1
2
3
1
2
1
2
3
1
2
3
1
2
3
4
5
6
1
2
DET.
1
2
DET.
J1
TEMP. FUSE
73˚ C
230V
OPERATION
PSU1 OK
PSU2 OK
L
N
RAIN SENSOR INPUT
MAINTENANCE
230V
BAT TERY
RESET
FUSE:
ERROR-MOTOR 1
25A
ERROR-MOTOR 2
L
N
ERROR-SMOKE DET.
RESET
ERROR-BREAK GLASS
+
–
ERROR-TEMP. FUSE
24V
24V
BAT TERY
ALARM AC TIVE
MOTOR 1
MOTOR 2
1
2
DET.
1
2
DET.
MOTOR 1
MOTOR 2
1
2
DET.
1
2
DET.
M
M
MOTOR 1
1
2
DET.
M
MOTOR 1
1
2
DET.
Wiring
Electrical cables should be drawn according to regulations by qualified per-
sonnel. The control system and its cables should be installed in compliance
with current national legislation and the requirements of local authorities.
Maximum cable length/prescribed cross-sectional size of
cables
The maximum allowed cable lengths between control unit and motor and the
prescribed cross sectional sizes of the cables are given in the table below. The
cable must be protected according to National/European Standards.
Calculation of max. cable length: 56 x A/l
A is cable cross-section and I is max motor current in total.
Allowed maximum voltage drop in the cable: 2 V
Operation current: The total of all motor currents.
Cable cross-section per motor terminal for smoke ventilation window
GGL/GGU -K-- ----40
Cable cross-
section
3 x 1.5 mm
* 5 x 1.5 mm
3 x 2.5 mm
* 5 x 2.5 mm
3 x 4 mm
3 x 6 mm
*) 2x2 conductors in parallel
Cable cross-section per motor terminal for smoke ventilation window CSP
Cable cross-
section
3 x 1.5 mm
CSP
* 5 x 1.5 mm
3 x 2.5 mm
* 5 x 2.5 mm
3 x 4 mm
3 x 6 mm
*) 2x2 conductors in parallel
Only one smoke ventilation window CSP per motor
terminal
230V/50Hz
MOTOR 1
MOTOR 2
ALARM
LINK
RAIN OUT
RAIN IN
FACU
ERROR
SMOKE
RAIN
COMFORT
BREAK GLASS POINT
L
N
PE
1
2
3
4
5
1
2
1
2
3
1
2
3
+ –
1
2
3
1
2
1
2
3
1
2
3
1
2
3
4
5
6
1
2
DET.
1
2
DET.
TEMP. FUSE
73˚ C
230V
OPERATION
PSU1 OK
PSU2 OK
L
N
RAIN SENSOR INPUT
MAINTENANCE
230V
BAT TERY
RESET
FUSE:
ERROR-MOTOR 1
25A
ERROR-MOTOR 2
L
N
ERROR-SMOKE DET.
RESET
ERROR-BREAK GLASS
+
–
ERROR-TEMP. FUSE
24V
24V
BAT TERY
ALARM AC TIVE
Max. cable length for
number of motors
*)
1
2
3
4
2
42 m
21 m
14 m
10 m
2
84 m
42 m
28 m
21 m
2
70 m
35 m
23 m
17 m
140 m 70 m
46 m
35 m
2
112 m 56 m
37 m
28 m
2
168 m 84 m
56 m
42 m
2
Max. cable length *)
8 m
2
2
17 m
2
14 m
2
28 m
22 m
2
33 m
2
VELUX
15
®
J1