Sample Vertical Termination Assembly-Room Air - Rinnai RU130i Installation Instructions Manual

Table of Contents

Advertisement

Sample Vertical Termination Assembly-Room Air

Header Tees Should be Schedule 40 Drain Tees.
Do Not Use Sharp Turn Tee's or Elbows
Room Air applications should
include an elbow and vent
screen or room air filter.
PVC/CPVC Common Venting Installation Instructions
Support Brackets Required
3 ft. (0.91 m)
Minimum
Between Brackets
NOTE
Vent termination per ANSI Z223.1/NFPA 54. For
clearances not specified in ANSI Z223.1/NFPA 54,
clearances are in accordance with local installation
codes and the requirements of the gas supplier.
Exhaust
Termination:
Elbow
3 ft. (0.91 m)
Minimum
Between Brackets
Condensate Trap
6 in (152 mm)
Minimum
15

Advertisement

Table of Contents
loading

Table of Contents