Sample Horizontal Termination Assembly
Header Tees Should be Schedule 40 Drain Tees.
Do Not Use Sharp Turn Tee's or Elbows
NOTE
Vent termination per ANSI Z223.1/NFPA 54. For
clearances not specified in ANSI Z223.1/NFPA 54,
clearances are in accordance with local installation
codes and the requirements of the gas supplier.
PVC/CPVC Common Venting Installation Instructions
Support Brackets Required
3 ft. (0.91 m)
Minimum
Between Brackets
3 ft. (0.91 m)
Minimum
Between Brackets
Combustion Air
Termination:
Tee or Elbow
Condensate Trap
6 in (152 mm)
Minimum
Exhaust
Termination:
Tee or Elbow
14