Installation - True Manufacturing Company STR Series Installation Manual

Table of Contents

Advertisement

TRUE
SPEC SERIES®: STR, STA & STG

INSTALLATION

OWNERSHIP
To ensure that your unit works properly from the first day, it must
be installed properly. We highly recommend a trained refrigeration
mechanic and electrician install your TRUE equipment. The cost of a
professional installation is money well spent.
Before you start to install your TRUE unit, carefully inspect it for
freight damage. If damage is discovered, immediately file a claim with
the delivery freight carrier.
TRUE is not responsible for damage incurred during shipment.
UNCRATING
TOOLS REQUIRED
Adjustable Wrench
1/2 inch socket (Castor Bolts)
3/4 inch socket (Skid Bolts)
Level
The following procedure is recommended for uncrating the unit:
A. Remove the outer packaging, (cardboard and bubbles or
Styrofoam corners and clear plastic). Inspect for concealed
damage. Again, immediately file a claim with the freight carrier
if there is damage.
B.
Move your unit as close to the final location as possible before
removing the wooden skid.
NOTE: KEYS FOR COOLERS WITH DOOR LOCKS
ARE LOCATED IN WARRANTY PACKETS.
3
LOCK AND KEYS
The following procedure is for locking and unlock unit:
A. Insert the key and turn.
B.
Remove the key.
.
www
truemfg
Insert key
.
com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents