Optional Accessories; Hard Water Kit (Apwm062); Apwm 019/020 Connector Box - Miele PWM 916 EL/RH Installations Plan

Commercial washing machine
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 24
Hard water kit
(APWM062)
APWM 019/020
Connector Box
Peak load / energy
management
Make sure that you only drill through the first panel (I) as there is a
deflecting panel (II) 10 mm behind it.
Connections 3 to 12 are provided for liquid detergent. High-pressure
dispensing systems with water injection must not be connected to
these connections. The connectors are sealed and must be cut to the
diameter of the hose with a small saw before they are connected.
If opened connectors are no longer required, they must be resealed
using a suitable sealant (e.g. silicone).
External dispensing pumps are connected and calibrated via the
Connector Box, which is available as an option.
A flowmeter or flow sensors can also be connected for monitoring the
dispensing quantity precisely.
Connections for level monitoring are available for every agent dis-
pensed.

Optional accessories

Only use genuine Miele spare parts and accessories with this ma-
chine.
Using spare parts or accessories from other manufacturers will in-
validate the warranty, and Miele cannot accept liability.
The hard water connection on the washing machine can be retrofitted
with the optional hard water kit (APWM062).
The additional water connection allows hard water to be used and
the programme running time will therefore be reduced. In addition,
hard water is particularly suitable for the final rinse cycles.
The Connector Box allows external hardware from Miele and other
suppliers to be connected to the Miele Professional washing machine.
Flowmeters for the water inlet can also be connected to the Con-
nector Box (APWM 065).
A peak-load or energy management system can be connected via the
Connector Box.
The energy management system monitors the energy consumption
of a system and deactivates individual pieces of equipment tempor-
arily by means of the peak-load negotiation in order to ensure that
certain total load limits are not exceeded.
en - Installation notes
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pwm 916 el dv ddPwm 916 el dv dd hsPwm 916 el dv dd stPwm 916 rh dv ddPwm 916 el dv dd wp

Table of Contents