Advertisement

Quick Links

PROTHIA
Installation Guide
www.proboil.co.uk
See top of boiler for contact details
 Please read these instructions carefully before
installation or use and retain for future reference.
You must install the tap and filter before the boiler.
We have a policy of continued product and quality development and improvement. Accordingly we reserve
the right to amend the specification at any time. All errors and omissions excepted.

Advertisement

Table of Contents
loading

Summary of Contents for PROBOIL PROTHIA PT1130

  • Page 1 PROTHIA Installation Guide www.proboil.co.uk See top of boiler for contact details  Please read these instructions carefully before installation or use and retain for future reference. You must install the tap and filter before the boiler.  We have a policy of continued product and quality development and improvement. Accordingly we reserve...
  • Page 2: Using The Product

    ⚠ A technical or safety   An information point or tip for A service, maintenance consideration or warning of installation or usage. or care consideration. hazardous situation with regard to life and property. Using the product Thank you for choosing this product. Reading this guide will ensure that the product is used safely and will give its best performance.
  • Page 3 Your tap can dispense 3 types of water: • Hot (boiled) filtered water Slide the hot (boiling) button across horizontally (Fig. 2) and then simultaneously turn the handle backwards (Fig. 3), the further backwards the handle is turned the greater the flow.
  • Page 4 Tap Warranty Terms and Conditions In the unlikely event that you should experience any defect in the materials or workmanship of your new Abode mixer within 5 years of purchase, the purchaser’s sole remedy shall be the replacement (at the manufacturer’s discretion) of all or any part of the product that is defective.
  • Page 5: Tap Installation

    Tap installation Important Technical Data Minimum operating pressure (hot): 0.75 bar Minimum operating pressure (cold): 1.5 bar Maximum operating pressure: 5.5 bar* Maximum domestic hot water temperature: 60°C* Flow characteristics: Domestic Hot & Cold share Recommended domestic hot water Temperature: 46°C outer single flow spout.
  • Page 6: Installation Preparation

    Installation Preparation ⚠ You must install the mixertap and filter before the boiler. ⚠ Before installing the new mixer it is essential that you thoroughly flush through the supply pipes in order to remove any remaining solder, swarf or impurities from your system. Failure to carry out this simple procedure could cause problems or damage to the workings of the mixertap or boiler.
  • Page 7: Parts And Contents

    Parts and Contents Key Description Mixer tap Base plinth Base plinth seal Sink or worktop (max. 50mm) White triangular plate (for use with steel sinks only) Lower gasket Metal horseshoe (M9) Fixing stud (M8 x 120mm) Fixing nut (M9) Domestic hot in (from mains feed) red banded flexible hose M8 x ½”BSPF Domestic cold in (from mains...
  • Page 8 Install the tap: This diagram shows the view of the base of the tap (A1) with the 98°C water handle to the left of the body. ⚠ YOU MUST CAREFULLY RESPECT THE INLETS AND OUTLETS AS SHOWN 1. Screw the fixing stud (A8) into base of tap (A1) as shown on the diagram. 2.
  • Page 9: Install The Filter

    Continue to flush the filter until the water runs clear. Once complete turn off the 98°C handle. 5. Please refer to ‘PROBOIL.2X User & Installation Guide’ for the next steps on how to install the boiler and connect the tap and filter.

Table of Contents