Huawei LUNA2000-97KWH-1H1 User Manual page 152

Hide thumbs Also See for LUNA2000-97KWH-1H1:
Table of Contents

Advertisement

LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual
Issue 10 (2023-11-07)
Figure 10-11 Searching for devices
NO TE
– During the process of Search for Device, do not perform upgrade operations (such
as upgrading through the app, management system, or WebUI).
– When you click Search for Device, cable connections (DC and AC) will be checked
before device search (not applicable to third-party devices), and device addresses
will be automatically allocated.
– After the cable connection check and device search are complete, if a cable
connection alarm is generated, you can click the alarm icon
corresponding alarm information.
– If an alarm is generated when the cable connection check fails, click the alarm icon
to view the alarm cause and handling suggestions. After the fault is rectified,
check the cable connections again.
– After the cable connection check and device search are complete, click
the corresponding topology information.
– After a device is added or deleted, you need to click Search for Device again in
Deployment Wizard. Otherwise, the system topology will not be updated.
Set parameters such as Microgrid compatibility and Grid Code.
Table 10-2 Parameter settings after device search (for versions earlier than
SmartLogger V300R023C10)
Parameter
Running under Grid connection
state
Copyright © Huawei Digital Power Technologies Co., Ltd.
10 Commissioning the ESS (SmartLogger WebUI)
Description
Set this parameter only for the PCS,
but not for the SUN2000.
– In the on-grid scenario, set this
parameter to On-grid(PQ).
– In the off-grid scenario, set this
parameter to Off-grid(VSG).