ULTIMATE SPEED 403814-2201 Operation And Safety Notes page 15

11 kw ev charger uswb 11 a1
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
If the RS485 interface needs to
be configured with an appro-
priate resistance, move the
2-pin cap from Pin1 & Pin2 to
Pin2 & Pin3, to connect it with
an appropriate R100 resistor.
In the same way, J103 can
be connected with an R101
adjustment resistor. In general,
the resistance of the Slave
machine which is furthest from
the Master machine needs to
be adjusted and J102/J103
must be connected with the
adjustment resistor at the same
time.
Position the pin caps as
follows:
With Smart Meter and
Master/Slave installation:
If you are only connecting one
charger to a mains supply, then no
further adjustments are required.
When delivered, the charger is
set for this application.
Without Smart Meter or Master/
Slave installation:
1) GATEWAY-485A/
GATEWAY-485B are used for the
Smart Meter Gateway connection.
2) NET1-485A/NET1-485B and
NET2-485A/NET2-485B are
used for Master/Slave connection.
3) COM is connected with the
earth of the secondary circuit.
Put the back cover
on and fix it in place with the
7 screws for the back cover
Now hang the charger
the metallic rear panel
hang it onto the wall, completely
over the metallic rear panel
Now screw the 4 fastening
screws
through the charger
6
onto the metallic rear panel
GB/IE/NI/CY/MT
back
20
.
16
onto
1
and
18
.
18
1
.
18
15