Philips 55PP9401 Service Manual page 45

Hide thumbs Also See for 55PP9401:
Table of Contents

Advertisement

High Voltage Check
Important Note: The high voltage should not be adjusted in the field. This
adjustment is performed at the production factory, using precise loads, and
should not be altered by the service technician. The following procedure is a
check only. Extreme caution should be exercised when measuring the high
voltage.
1. Connect a high voltage meter to the FBT high voltage output and connect the ground
of the high voltage meter to the CPT ground or FBT ground.
2. Confirm that the high voltage reading is within the specified range (30.2kV +/-
0.2kV).
High Voltage Check Diagram
Adjustment Magnet Locations
Adjustment Magnet Location Diagram
7618 Service Adjustments page 14

Advertisement

Table of Contents
loading

Table of Contents