Advertisement

Quick Links

Watkins Wellness
INSTALLATION
ProLift
Of your
INSTALLATION REQUIREMENTS ................. 1
INSTALLATION REQUIREMENTS ................. 2
PROLIFT II INSTALLATION ............................. 4
PROLIFT II INSTALLATION ............................. 5
®
®
II

TABLE OF CONTENTS

INTENDED USE IN KIT # 74033
ATTACH CROSSLINK ASSY.
PROLIFT II INSTALLATION ............................. 7
PROLIFT II INSTALLATION ............................. 9
PROLIFT II INSTALLATION ........................... 10
PROLIFT II SPACERS
62735 E (04/19)

Advertisement

Table of Contents
loading

Summary of Contents for Watkins Wellness ProLift II

  • Page 1: Table Of Contents

    INSTALLATION REQUIREMENTS ....2 ATTACH SIDE ARM ASSY. ALIGN SIDE ARM ASSY. TOOLS REQUIRED IMPORTANT INFORMATION PROLIFT II INSTALLATION ......9 PROLIFT II INSTALLATION PREPARATION . 3 INSTALL GAS SPRING INSTALL PREPARATION PROLIFT II INSTALLATION ......10 LOCATE PLATES PROLIFT II SPACERS PROLIFT II INSTALLATION ......
  • Page 2: Installation Requirements

    INSTALLATION REQUIREMENTS KIT INCLUDES LEFT PIVOT ASSY. RIGHT PIVOT ASSY. 54° BAG #1 (72574) BAG #4 BAG #2 BAG #3 (72715) Not used in this kit Not used in this kit PART QUANTITY DESCRIPTION PART QUANTITY DESCRIPTION Pivot Assembly, Right #10 x 1”...
  • Page 3: Installation Requirements

    INSTALLATION REQUIREMENTS TOOLS REQUIRED Cordless Drill Flat Head Screwdriver 7/16” Socket with #2 Square Drive Bit Ratchet 1/8” Drill Bit Fine Tip Marker Safety Glasses (3.175mm) IMPORTANT INFORMATION • One Technician is recommended for this installation. • Read all of the instructions thoroughly before performing this installation. •...
  • Page 4: Prolift Ii Installation Preparation

    PROLIFT II INSTALLATION PREPARATION STEP 1 INSTALL PREPARATION The cover warning label must be facing the front of the spa on (Front to Back) • Refer to (Figure 1.1) for the Left and Right cover confi guration or the right side of spa on lifter set orientation for (Front to Back) cover (Side to Side) confi...
  • Page 5: Prolift Ii Installation

    PROLIFT II INSTALLATION two of the #10 x 1½”square (J) Flat Head STEP 1 ATTACH BACK HINGES screws on the top (marked) holes fi rst. 4. Using the 1/8”(3mm) drill bit and the bottom 1. Locate Bag #1. Some of the contents will be two holes of the Side Hinge, drill through the used to fasten the Rear Hinges.
  • Page 6: Prolift Ii Installation

    PROLIFT II INSTALLATION IMPORTANT: Carefully examine cover to be STEP 4 ATTACH CROSSLINK ASSY. sure it is still aligned evenly with the outside edges of the spa bar top (Figure 1.3). 1. Unscrew Pan Head Screws attached to the 4. Using the Mounting Bracket (bottom part Rear Hinges (G) (Figure 5.1).
  • Page 7: Prolift Ii Installation

    PROLIFT II INSTALLATION SPAS WITH REMOVABLE SPAS WITH NON-REMOVABLE SPAS WITH PLASTIC OR PANELS PANELS METAL FRAME Figure 5.4 a. Spas with Removable Panels b. Spas with Non-removable Panels Spas with Plastic or Metal Frame 1. Secure the Mounting Not compatible.
  • Page 8: Attach Side Arm Assy

    PROLIFT II INSTALLATION 1. Locate the Cardboard Template (H) and place ATTACH SIDE ARM ASSY STEP 5 on ground below Side Arm Assembly (Figure 7.1). 1. Remove the single bolt attached to the Side Hinge (F) (Figure 6.1) on the side of the spa.
  • Page 9 PROLIFT II INSTALLATION SPAS WITH REMOVABLE SPAS WITH NON- SPAS WITH PLASTIC OR PANELS REMOVABLE PANELS METAL FRAME Figure 7.2 a. Spas with Removable Panels b. Spas with Non-removable Panels Spas with Plastic or Metal Frame 1. Secure the Side Arm Not Compatible.
  • Page 10: Install Gas Spring

    PROLIFT II INSTALLATION STEP 7 INSTALL GAS SPRING 1. Locate the Gas Spring (C) and snap onto the upper ball stud (attached to the Pivot Arm Assembly) with the barrel end of the Gas Spring up (Figure 8.1). Figure 8.2...
  • Page 11 Watkins Wellness ® INSTALLATION ® ProLift II Spacers Of the ® UTOPIA SPAS ONLY (2016-CURRENT) PART QUANTITY DESCRIPTION Top Mounting Bracket Spacer, Left Top Mounting Bracket Spacer, Right Side Pivot Bracket Spacer, Left Side Pivot Bracket Spacer, Right (INTENDED USE KITS: 77699, 77702, 78033)
  • Page 12 MOUNTING BRACKET SPACER INSTALLATION STEP 3 ALIGN MOUNTING BRACKET WITH SPA SECURE MOUNTING BRACKETS & SPACERS TO SPA STEP 1 1. Rotate Pivot Assemblies until the 1. Making sure to align the holes on the bracket bottom (Mounting Bracket) touches the to the holes on the spacer (P1), secure the side of the spa (Figure 1.1).
  • Page 13 PIVOT BRACKET SPACER INSTALLATION ALIGN SIDE ARM ASSY. STEP 1 STEP 3 SECURE PIVOT BRACKETS & SPACERS TO SPA 1. Locate the Template (H) and place on 1. Remove the two screws (L) from the back ground below Side Arm Assembly (Figure of T1 or S1.
  • Page 14 62735 E (04/19)

Table of Contents