Table of Contents

Advertisement

Plow (continued)
5. Reduce the attachment speed to a point with the least machine vibration and the highest
ground drive speed possible.
6. Check the installed product for any damage during plowing.
Finishing the Job
1. When the installation is complete, move the ground drive control to N
2. With the vibrator running, raise the plow to ground level while reducing the vibrator
speed.
Note:
3. Move the plow vibrator control to O
4. Engage the parking brake.
5. Shut off the machine and remove the product from the plow.
6. Swing the plow to the center position and engage the swing lock.
7. Start the engine.
8. Disengage the parking brake.
9. Drive a short distance away from the work site.
10. Shut off the machine.

Trench

Setting Up for Trenching
1. Fasten and adjust the seat belt.
2. Start the machine.
3. Drive to the starting point. Move in line with the planned trench.
4. Lower the boom to just above the ground.
5. Check that the attachment and ground drive controls are in neutral.
Digging a Trench
Thrown objects can cause death or serious injury. Stay away from moving objects.
To help avoid injury:
• Keep everyone at least 2 m (6 feet) from the machine, attachments, and their range
of movement.
• Know the soil conditions and adjust the digging speed accordingly.
3467-222A
Do not operate the vibrator when the plow is out of the ground.
.
FF
WARNING
Page 5–12
.
EUTRAL
Operation: During Operation

Advertisement

Table of Contents
loading

This manual is also suitable for:

25530tMaxi sneaker 37025546t

Table of Contents