Cell Connections; Software Installation; System Requirements; Interface Adapter - Texas Instruments bq77908AEVM User Manual

Table of Contents

Advertisement

Software Installation

7. Monitor the CHG and DSG test points using a meter or oscilloscope as desired.
8. Enable the load with a nominal 0.2-A or other current within the capability of the supply.
9. Increase the bench supply voltage to approximately 34 V, and observe that the CHG test point goes
low.
10. Reduce the voltage to approximately 29 V, and observe that the CHG test point returns high.
11. Decrease the voltage to approximately 20 V, and observe that the DSG test point goes low and the
load current drops. The device shuts down after 9 seconds at low voltage.
12. Remove the load, and connect the CHGCTL resistor to the supply to simulate a charger.
13. Increase the supply voltage to approximately 29 V, and observe that the DSG test point goes high,
and if the load is re-connected, that current flows again.
3.6

Cell Connections

For initial evaluation, it is suggested power supplies be used for cell simulation to observe the behavior of
the device. An isolated power supply with a resistor connected across its terminals may be connected to
test points on the resistor simulator to vary the voltage above or below the voltage of the other cells, or a
similar configuration may be used. The smaller the resistor value, the more current is required from the
battery simulator power supply and the smaller the influence on the voltages if cell balancing is operated.
Whether power supplies or cells are used, inductance in the high-current path must be minimized.
Inductance in this path can cause inductive transients at the board when the load current is stopped or the
bq77908A opens the discharge FET with current flow. Use heavy-gauge wires for the high-current
connections; minimize inductances by keeping leads close together.
When connecting cells to the EVM, the user must use care not to exceed the absolute maximum ratings of
the device. The bq77908A is designed with open-cell (wire) detection; however, fixturing must not pull
unconnected signals up or down. Signal reference (VSS) for the part is from the BATT– terminal of the
EVM, and this lowest potential must be connected first. Cells must be connected in sequence from lowest
to highest voltage as described in the data sheet. When terminating the cells to the removable terminal
blocks prior to connection to the EVM, the following steps are recommended:
1. Be sure the charger and any load is disconnected (CHGCTL is open).
2. Connect the cell stack negative high-current terminal to the EVM BATT– terminal.
3. Connect the lower cell group to the J5 connector.
4. Connect the upper cell group to the J4 connector.
5. Connect the cell stack positive high-current terminal to the EVM PACK+ terminal.
6. When removing cells, remove any charger and CHGCTL connection, then disconnect in the reverse
order.
4
Software Installation
This section describes how to install the software for the bq77908AEVM-001.
The BQ77908-10-GUI SW supports the bq77908A, and is described in this document as bq77908A
evaluation software.
4.1

System Requirements

The bq77908A evaluation software requires a 32-bit version of Windows XP, Windows Vista, or Windows
7. The computer must also have Microsoft
this document are from Windows XP.
4.2

Interface Adapter

The bq77908A evaluation software supports either the TI USB-TO-GPIO adapter (TI USB Interface
Adapter) or the Total Phase Aardvark™ to provide communication with the EVM board from the computer.
The Total Phase Aardvark must be selected if desired. The EVM connector supports the TI USB Interface
Adapter; a special cable must be constructed if you wish to use the Aardvark.
8
bq77908AEVM Evaluation Module
.NET framework version 2.0 or higher installed. Examples in
®
Copyright © 2012, Texas Instruments Incorporated
www.ti.com
SLUU854 – February 2012
Submit Documentation Feedback

Advertisement

Table of Contents
loading

Table of Contents