LG WK22 S6 Series Owner's Manual page 21

Laundry center
Table of Contents

Advertisement

3
Thread a 30-amp, 240 volt, 3-wire, UL-listed
power cord with #10 AWG-minimum copper
conductor through the strain relief.
a
Terminal Block
UL-Listed Strain Relief
b
UL-Listed 3-Wire Power Cord
c
4
Attach the two hot leads (black and red) of the
power cord to the outer terminal block screws.
5
Attach the neutral (white) wire to the center
terminal block screw.
6
Connect the external ground (if required by
local codes) to the green ground screw.
7
Tighten all screws securely.
8
Reinstall the terminal block access cover.
a
White Wire from Dryer harness
b
Hot Leads of Power Cord (Black and Red)
c
Neutral Wire (White)
External Ground Wire (If required by local
d
codes)
e
Ground Screw (green)
Three-Wire Direct Wire
• A 3-wire connection is NOT
permitted on new construction
after January 1, 1996.
• A UL-listed strain relief is required.
• Use UL-listed 3-wire, #10 AWG minimum
copper conductor cable. Allow at least 1.5 m
length to allow for removal and installation of
dryer.
1
Remove 8.9 cm of the outer covering from the
wire. Strip 2.5 cm insulation from each wire.
Bend the ends of the three wires into a hook
shape.
2
Remove the terminal block access cover on the
upper back of the appliance.
3
Install UL-listed strain relief into the power
cord through-hole.
4
Thread the 3-wire, #10 AWG minimum copper
conductor power cable prepared in step 1
through the strain relief.
INSTALLATION
1'' (2.5 cm)
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wk22 s6e series

Table of Contents