Reception, Assembly And Initial Set-Up - Walinga Airlock 1008 Operator's Manual

Table of Contents

Advertisement

OPERATOR'S MANUAL

RECEPTION, ASSEMBLY AND INITIAL SET-UP

ASSEMBLY
Airlocks that are shipped separately or as part of a partially assembled system, require extra
precautions to be taken to protect the internals of the airlock. To prevent premature failure due
to dirt, dust, or debris that may enter during shipping, exposed airlocks will be fitted with
shipping debris covers. The covers, as seen in Figure 5-1 must be removed from the airlock
during assembly and before any operation of the airlock is started. Do not dispose of the debris
covers as they may be used during transport or storage of the airlock.
Figure 5-1: Airlock debris covers
Due to the wide range of applications and systems in which a Walinga airlock may be used,
refer to the operator's manual of the auxiliary equipment for any additional procedures required
for assembly upon initial reception of the airlock.
5-2
00-144475-0 A
MACHINE LIFE-CYCLE PROCEDURES

Advertisement

Table of Contents
loading

Table of Contents