Hisense YJE-C01T Use And Installation Instructions page 21

Hide thumbs Also See for YJE-C01T:
Table of Contents

Advertisement

Installation Instructions
2. Removing the upper cover of the central controller.
Screw driver
3. Connecting the central controller
①Leading-out line
Pull the power supply line of the central controller and central control communication
line out of the embedded terminal box (to be provided by users) for connecting them to
the terminal block on the rear cover of the central controller, as shown in the figure below:
Rear cover of central controller
② Connections
Insert a normal screw driver into the position,
and gently rotate it. In this way, the upper
cover can be easily removed.
Central control
communication line
Power supply line of central controller
Power supply:220V ~/50Hz
Power supply terminal
Central controller
19
Upper cover of the
central controller
Lower cover of the central controller
Embedded terminal box
A+ B-
Central control
communication terminal

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yje-c01te

Table of Contents