Table of Contents

Advertisement

STEP 1
1.
Attach the Weight Storage Post (#10) to the Base ASSY (#1) using:
one M10*70 Socket Head Cap Bolt (#22)
one Φ11*Φ20*1.5 Flat Washer (#27)
2.
Attach the two Carriage Supports (#4) to the Base ASSY (#1) using:
four M10*25 Socket Head Cap Bolts (#20)
four Φ10 Spring Washers (#25)
four Φ11*Φ20*1.5 Flat Washers (#27)
Note: Only hand tighten bolts at this stage.

ASSEMBLY

9

Advertisement

Table of Contents
loading

Table of Contents