Leveling The Unit; Connecting The Water Supply - U-Line Echelon 2075DWRRSS User Manual

Echelon series
Hide thumbs Also See for Echelon 2075DWRRSS:
Table of Contents

Advertisement

4.
– Connect the water supply line. See CONNECTING THE
WATER SUPPLY for installation requirements.
5. Position the unit to allow free air flow through the front grille
(Figure 4).
6. Wipe inside of unit and all inside drawer components with a clean,
water dampened cloth only.
It is important that the unit is level. All Échelon™ Series units are
equipped with adjustable feet for leveling and height adjustment
(Figure 5).
To level the unit:
1. Adjust all four leveling feet evenly so that the top of the cabinet is at
the desired installation height.
2. Using a level of at least two feet in length, measure the level of the
floor where the unit is to be installed. Measure back-to-front and
side-to-side and note the measurements.
3. With the unit on a level surface, adjust the feet, as appropriate, to
compensate for the floor level measurements noted in Step 2.
Figure 4

LEVELING THE UNIT

9
OFF
ON
DWR004

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Echelon 2075DWRRSS and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents