U-Line Echelon 2075DWRRSS User Manual page 16

Echelon series
Hide thumbs Also See for Echelon 2075DWRRSS:
Table of Contents

Advertisement

User's Manual
5. On a clean surface, place the wood panel face down and tape the
existing drawer panel (removed in step 3) on the back of the wood
panel (Figure 14) and drill the five (5) holes (5/32" drill 3/8" deep)
through the coated steel panel and 3/8" into the wood panel
according to the diagram (Figure 15). Remove tape from the draw-
er panel, and enlarge the five holes in the front panel using a .0201"
drill (#7) drill.
SIDE OF
WOOD PANEL
TOP OF WOOD PANEL
A
C
BACK OF
WOOD PANEL
11/32" BOTTOM
5/32" X 3/8" DEEP
5 PLACES
1"
11-7/8"
DOOR PANEL
TAPE
3/8" BOTH SIDES
Figure 14
23-3/4"
Figure 15
16
16
BOTTOM OF
WOOD PANEL
DWR_OL_003
VINYL COATED
STEEL PANEL
B
1"
DWR_OL_004b

Advertisement

Table of Contents
loading

Table of Contents