Installation Practice; Water Inlet Solenoid Valve - Ice-O-Matic UCG 45 Installation And Service Manual

Hide thumbs Also See for UCG 45:
Table of Contents

Advertisement

12. Has the owner been given the name and the phone number of the authorized Ice‐O‐Matic 
Service Agency serving him/her? 
 
G.
INSTALLATION PRACTICE 
 
WARNING: This icemaker is not designed for outdoor installation and will not function in 
 
ambient temperatures below 50˚F (10˚C) and above 100˚F (40˚C).  This ice maker will 
 
malfunction with water temperatures below 40˚F (5˚C) or above 90˚F (35˚C). 
 
H.   OPERATING INSTRUCTIONS 
START UP 
After having correctly installed the ice maker and completed the plumbing and electrical connections, 
perform the following "start‐up" procedure. 
UCG45/65/85/105 
A ‐Remove the unit front panel and locate the cleaning switch on the control box. 
B‐ Set the cleaning switch in the cleaning position (II). This will close the electrical circuit to the water 
inlet valve and to the hot gas valve. 
C‐ Switch ON the power line disconnect switch. Unit will start up in water filling phase mode. During 
this phase the components energized are: 
WATER INLET SOLENOID VALVE  
HOT GAS SOLENOID VALVE 
The Water pump and the  F an motor are also in operation. 
D‐ Let unit stay in water filling phase mode for about three/four minutes till water is coming out from 
the drain hose, then move the cleaning switch to the operation position (I). 
 
UCG GOURMET SERIES UNDERCOUNTER 
 
 
pg. 6 

Advertisement

Table of Contents
loading

Table of Contents