h. Insert the plastic plug or the screw-type reference electrode into the flow module.
For typical QCM flow systems, insert the reference-electrode plug and seal it with an Allen key
as shown here.
For eQCM flow systems, insert the connection to a peristaltic pump. The connection is a very
snug fit.
i.
Carefully slide the plastic tubing onto the platinum tube. This can be a very snug fit.
Cell Connections
27