Chapter 4: Installation

This chapter of the eQCM 15M Operator's Manual covers normal installation of the instrument.
These instructions assume use with Gamry's Framework Software Revision 7.9 or higher.

Initial Visual Inspection

After you remove your eQCM 15M from its shipping carton, check it for any signs of shipping damage. If you
find any damage, please notify Gamry Instruments, Inc., and the shipping carrier immediately. Save the
shipping container for possible inspection by the carrier.
Warning:
verified its safety. Tag a damaged eQCM 15M to indicate that it could be a safety hazard.
Caution:
winter conditions) to a warm, humid location, water vapor could condense on the cold surfaces inside the
instrument, possibly creating a hazardous condition. Before connecting power to a "cold" eQCM 15M,
allow at least one hour for the instrument to warm up to room temperature.

Physical Location

Place your eQCM 15M on a flat workbench surface. You need access to the rear of the instrument because
some cable connections are made from the rear. The eQCM 15M is generally operated in a horizontal position
(see Figure 4-1). Operation in other positions is possible as long as you ensure that air movement around the
chassis is not restricted.
Installation
Figure 4-1
Front View of an eQCM 15M
Do not operate damaged apparatus until a qualified service technician has
If the eQCM 15M is taken from a cold location (for example, outdoors in
15