Start-Up Procedure - Prodew FogMist Track System Installation Manual

System for produce cases
Hide thumbs Also See for FogMist Track:
Table of Contents

Advertisement

1. Plug in the air compressor(s) into the outlet on the timer box. Plug the timer's 110V plug and transformer
into the city power supply outlet.
2. Ensure that you have water and power.
3. Confirm that everything is plugged in and connected.
4. Turn on water valve and check the inlet pressure by looking at the solenoid box gauge. The pressure is
factory set to 30 PSI. Adjust the pressure by opening the solenoid box and rotating the black knob by
hand or screw driver. Increase the water pressure to increase fog density (See Image 1 below).
5. Set OFF TIME to its minimum (0.5 min) and ON TIME to maximum settings (2.5 min). Remove the stem
plugs from the air and water lines at the end of the line where the last nozzle is located.
(See Steps to Set the Timer - pg 10)
6. Flip the toggle switch on the timer box to ON position. The air compressor should start after 5 seconds.
Flush one cycle and then replace the plugs.
7. Check the air pressure by looking at the gauge on the air compressor. The air pressure should be 15-20
PSI (higher air pressure preferred, but do not exceed 20 PSI). If it's not correct, adjust the air pressure
on the air compressor with the allen wrench (See Image 2 below).
8. Let the system run for several cycles until all nozzles are spraying.
9. Check for leaks and ensure proper mist pattern. Ensure all nozzles are spraying. If not, see
Troubleshooting Guide.
10. Set the timer to recommended settings (See Recommended Timer Settings - pg 10).
System is ready for use.