Download Print this page

Start-Up Procedures - Prodew FogMist Track Installation Manual

Hide thumbs Also See for FogMist Track:

Advertisement

Start-up Procedures

Plug the air compressor(s) into the outlet on the timer box. Plug the
1
timer's 110V transformer into the city power supply outlet.
Turn on water valve and check the inlet pressure by looking at the
3
solenoid box gauge. The pressure is factory set to 30 PSI. Adjust the
pressure by opening the solenoid box and rotating the black knob by hand
or screw driver. Increase the water pressure to increase fog density.
Ensure that you have water and power. Confirm
2
that everything is plugged in and connected.
Set OFF TIME to its minimum (0.5 min) and ON Time to
4
maximum settings (2.5 min). Remove the stem plugs from
the air and water lines at the end of the line where the last
nozzle is located.
(See Steps to Set the Timer - pg 20)
15

Advertisement

loading

This manual is also suitable for:

Hcom001-2hd-fog