BTC22-*
Installation
3.
Screw M4, tightening torque: 0.7 ± 0.1 Nm
Figure 4.11
4.2
Electrical Connection
Power consumption at 19 V supply voltage:
•
Maximum load: 33 W (2x FHD Monitore, CPU full load, 14W USB loads)
•
Normal operation: 18.5 (2x FHD Monitore, CPU full load, Mouse, Keyboard)
Commissioning
1.
Remove the dummy plugs from the ports where connections are to be made. To prevent dust
ingress, leave the dummy plugs in ports that are not in use.
2.
Connect the BTC22 to the network via the Ethernet port.
3.
Connect the BTC22 to the mouse and keyboard via the USB 2.0 port.
4.
Connect the BTC22 to the display via a DisplayPort™. The DisplayPort™ interface provides
mechanical strain relief to protect against vibration. Locking mechanisms are available as
accessories for additional strain relief.
5.
Optional strain-relief locking mechanisms can also be attached to the USB ports.
6.
Connect the BTC22 to the AC/DC power supply (e.g., FSP065-REBN2).
Note
Strain-relief locking mechanisms are available as accessories. The screws required to secure
the locking mechanisms are supplied in the scope of delivery for the BTC22.
25