Quick MILL QM67 Owner's Manual page 4

Dual boiler espresso machine
Hide thumbs Also See for QM67:
Table of Contents

Advertisement

First Time Set Up, Continued
• Before plugging the machine in, verify the steam and hot water knobs are closed and
the brew lever is in the down position. Also make sure the power switches are in the
off position and the drip tray is in place.
• Plug the machine into the
on position.
• The pump will come on to fill the boilers and then will turn off after the boilers have
completed filling.
• If the pump turns off and the PID and heating lights do not come on then the water
reservoir needs to be refilled. It may take 2 reservoirs to completely fill both boilers.
• After the boilers have finished filling then place whichever portafilter you intend to use
into the group head. Then lift the brew lever to activate the pump and keep the lever
up until water comes out of the portafilter for at least 15 seconds and then lower the
brew lever.
• The heating indicator light and PID will illuminate and the machine will start heating.
You will hear some gurgling noises and a small amount of steam and water will be
discharged into the drip tray. This is normal to allow for the release of air and the
expansion of water in the boiler.
• If you plan on steaming milk or using the hot water wand then also be sure to turn on
the steam boiler power switch. The coffee boiler power switch must also be on for the
steam boiler to operate.
• The machine should reach temperature in approximately 15 minutes, but to make
delicious espresso with thick rich crema it is necessary to allow the machine to be
heated for 30-45 minutes with the portafilter kept in the grouphead.
* The electrical outlet must be a 3 prong 115V grounded outlet. No adaptors or extension
cords should be used. A timer may be used to turn the machine on and off, but it must be a 3
prong grounded timer rated for 15 amps. A GFCI outlet is highly recommended but is not
necessary.
QM67 Dual Boiler Espresso Machine
outlet*
and then turn the coffee boiler power switch to the
Page 4

Advertisement

Table of Contents
loading

Table of Contents