Units installation

10 UNITS INSTALLATION
10.1 RASC UNITS INSTALLATION
10.1.1 Initial check
C A U T I O N
9
PMML0319A rev.1 - 06/2015
10.1.2 Transportation
Hanging method
When hanging the unit, ensure the balance of the unit, check
safety and lift it up smoothly. Do not remove any packing
materials and hang the unit under packing condition with two
Wire rope
C A U T I O N
Do not remove the plastic band
or the corrugate paper frame
Pass the wire ropes
through each lifting hole in
the base as shown