Infrastructure Device Deployment And Installation; Figure 2-6 Close Up Of External Connection Points - Motorola MOTOMESH DUO 4300 User Manual

Table of Contents

Advertisement

Figure 2-6

Infrastructure Device Deployment and Installation

The MWR and the IAP devices require professional installation to ensure that the installation is
performed in accordance with FCC licensing regulations. All common precautions for grounding and
electrostatic discharge protection should be observed during deployment and installation.
Observe the following additional guidelines when deploying fixed Infrastructure devices (MWR and
IAP):
May 2007
Close Up of External Connection Points
The MOTOMESH Duo 4300 device may be mounted on a pole having a diameter of 1-
3.5 inches, utilizing the provided brackets.
The antenna must have a separation distance of at least 2 meters from the body of all
persons and must not be co-located or operating in conjunction with any other antenna
or transmitter.
Users and installers must be provided with antenna installation and transmitter operating
conditions to satisfy RF exposure compliance.
When deploying the MOTOMESH Duo 4300 device, the antenna(s) should be a
minimum of 30 inches from any nearby metal poles to avoid distortion of the RF pattern.
The installation location must provide power to the MOTOMESH DUO 4300 Device.
It is the responsibility of the Network Operator to ensure that the installation complies
with any local building codes and permits.
MOTOMESH DUO 4300 Users Guide
2-7

Advertisement

Table of Contents
loading

Table of Contents