4.1) Assembly of the machine
Select the rail to be worked on and the direction of operation, then assemble the machine as
follows, referring to fi g. 4:
1
–
With knob (29) engaged and wheel (34) blocked, raise the clamp unit by means of
the handles (33) and rest this on the selected rail, positioning it in line with a
2
sleeper for stability.
–
Rest the support carriage on the track and then pull and turn the fastening/release
knob (48). Lift the clamp unit by means of the handle (21) and locate (19) pins fully
into their carriage housings as far as the stop.
Release the knob (48) to lock the clamp unit.
26
7
rd
3
WHEEL BAR
CARRIAGE
FIG. 2 – TRANSPORTING THE UNITS
4. INSTRUCTIONS FOR USE
PUMP UNIT