Mitsubishi Electric PCA-M100KA/PUHZ-ZRP100YKA Service Manual page 62

Ceiling suspended
Table of Contents

Advertisement

OPERATING PROCEDURE
13. Removing the heat exchanger
(1) Remove the air intake grille. (See Figure 1, 2)
(2) Remove the beam. (See Photo 1)
(3) Remove the electrical cover. (See Photo 1)
(4) Pull the electrical box downward. (See Photo 2)
(5) Remove the left and right side panels. (See Figure 3)
(6) Remove the under panel. (See Photo 14)
(7) Remove the drain pan. (See Photo 15,16,17)
(8) Remove the pipe cover. (See Photo 18)
(9) Remove the pipe thermistors (TH2 and TH5) from each
holder. (See Photo 19)
(10) Remove the pipe band fixing screw and remove the
pipe band. (See Photo 22)
(11) Remove 2 screws from the heat exchanger and
remove the heat exchanger.
OCH659
PHOTOS & ILLUSTRATIONS
Photo 22
Photo 23
Heat exchanger
fixing screws
Heat exchanger
51
Heat exchanger
Pipe band
Pipe band fixing
screw
Vane

Advertisement

Table of Contents
loading

Table of Contents