Kohler rada VZ1 10 Installation And User Manual page 11

Thermostatic bar valve
Table of Contents

Advertisement

Installation of Bar Valve
HOT
Fit the plastic pipe guide over the inlet
pipes. Level the pipe guide and secure
to the wall to hold in position. Leave
the guide in place and finish the wall.
Wall Bracket
Ø6 mm
COLD
Plastic Pipe
Guide
Note: Connections are; Hot-Left,
Cold- Right.
8 mm
11
25 mm
25 mm
1320703-W2-B

Advertisement

Table of Contents
loading

Table of Contents