Technical data depend on the order. They are shown in the order confirmation, in the approval drawing or in
the test book.
6
Installation
Assembly depends on the local environment. The crane must be assembles stress-free. The runway must
be perfect.
Operating regulations for cranes in accordance with the validated accident prevention regulations
An end stop is provided at the end of jib.
Generally, additional lifting gear (e.g. fork lift, lifting platforms) will be required for the assembly.These must
take the weight of the devices safely.
6.1
Wall fastening
prepare fixing holes in the wall
put the wall bracket (1) onto the wall
Fix it with screws, discs and nuts (2) (on site)
Put through axle (4)
Adjust with water-level
Tighten screws (2)
Remove axle (4) again
Push the jib with ball bearings (3) into the wall
bracket
Put through the axle (4) from the bottom or
from the top again.
Protect with pin lock (5) and screw (6)
Check eventually existing end stops.
For mounting of hoist unit and power supply see separate instruction.
Installation – Adjustable locking disc
6.2
Mount the stop brackets (3) on the locking disc
(2) at desired position.
Mount screws, nuts and castle nuts M12
Swivel jib to check position.
Tighten screws firmly.
Check screw connection!
NOTICE!
If the locking disc is to be mounted on an existing wall-mounted jib crane, the corresponding holes must be
drilled for the mounting on the opposite side.
6.3
Tools
No special tools necessary.