4. Lift the cooling unit above the PCU cabinet with a crane.
5. Align the cooling unit with the opening (2) in the cabinet roof and slowly lower the cooling
unit onto the cabinet roof.
IMPORTANT! Ensure that the screw holes on the roof and the cooling unit match up.
6. Secure the cooling unit to the cabinet roof with the supplied screws.
7. Remove the rotating eyebolts that you installed in step 1.
8. Feed the cables from the cooling unit into the cabinet.
NOTE – You might need to remove the back wall of the cabinet to gain access to the cables.
Referring to Fig. 41, page 75:
9. Route the cables along the pre-installed white cable brackets and through the designated
openings (1) into the front of the cable duct.
IMPORTANT! Use cable binders to fix the cables to the cable brackets.

Fig. 41. Cable duct openings (example with 1700 mm PCU)

10. In the cable duct at the front of the cabinet, connect the cables according to
"Appendix D – Wiring diagrams".
PRODUCT
ACS5000W gen. 2
DOCUMENT KIND
User manual
DOCUMENT ID.
3BHS799208 E01
MECHANICAL INSTALLATION
1
REV.
LANG.
PAGE
J
en
75/186

Advertisement

Table of Contents
loading

Table of Contents