Assembly & Set-Up - MTD 62BD Operator's Manual

Two-stage snow thrower
Table of Contents

Advertisement

Assembly & Set-Up
Contents of Carton
One Snow Thrower
One Snow Thrower Operator's
Manual
Assembly
Handle
1.
Observe the lower rear area of the snow thrower to be sure
both cables are aligned with roller guides before pivoting
the handle upward. See Fig. 3-1.
NOTE: Make certain the upper ends of each cable are
seated properly in its pulley. See Fig. 3-2.
Figure 3-1
2.
Secure the handle by tightening the plastic knob located
on both the left and right sides of the handle. Remove
and discard any rubber bands, if present. They are for
packaging purposes only.
Chute Assembly
1.
Position the chute assembly over the base. See Fig. 3-3.
Two Replacement Auger Shear Pins
One Engine Operator's Manual
One Chute Assembly
One Product Registration Card
Figure 3-2
Figure 3-3
3
7

Advertisement

Table of Contents
loading

Table of Contents