Test And Operation - Toyotomi TAN-A10SC User Manual

Wall mounted air conditioner inverter type
Table of Contents

Advertisement

Available languages

Available languages

Replace new batteries of the same model when replacement is
required.
When you don't use remote controller for a long time, please take
out the batteries.
If the display on remote controller is fuzzy or there's no display,
please replace batteries.

TEST AND OPERATION

Check after installation
Check according to the following requirement after finishing installation.
Items to be checked
Has the unit been installed firmly?
Have you done the refrigerant
leakage test?
Is heat insulation of pipeline
sufficient?
Is water drained well?
Is the voltage of power supply
according to the voltage marked
on the nameplate?
Is electric wiring and pipeline
installed correctly?
Is the unit grounded securely?
Does the power cord follow the
specification?
Is there any obstruction in the air
inlet and outlet?
The dust and sundries caused
during installation are removed?
The gas valve and liquid valve
of connection pipe are open
completely?
Is the inlet and outlet of piping
hole been covered?
Possible malfunction
The unit may drop, shake or emit
noise.
It may cause insufficient cooling
(heating) capacity.
It may cause condensation and
water dripping.
It may cause condensation and
water dripping.
It may cause malfunction or
damage the parts.
It may cause malfunction or
damage the parts.
It may cause electric leakage.
It may cause malfunction or
damage the parts.
It may cause insufficient
cooling(heating) capacity.
It may cause malfunction or
damage the parts.
It may cause insufficient cooling
(heating) capacity.
It may cause insufficient cooling
(heating) capacity or waste
electricity.
46
GB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tag-a10scTan-a13scTag-a13scTan-a18scTag-a18sc

Table of Contents