Friedrich SG Series Installation And Operation Manual page 15

Ptac packaged terminal air conditioners & heat pumps
Hide thumbs Also See for SG Series:
Table of Contents

Advertisement

Figure 15
TRIM HARNESS
TO LENGTH
3.
Route the cut ends of harness through the conduit connector
assembly and flex conduit sleeve. Be sure to use the supplied
conduit bushing to prevent damage to the cord by the conduit.
The cord should pass through the Locknut, Spacer, Chassis
Junction Box, Conduit Connector, Bushing, then the Conduit
Sleeve. See Figure 17.
4.
Route the cut ends of the power cord through the elbow connector
at the other end of the conduit. Tighten screws on elbow connector
to secure conduit sleeve.
5.
Fasten and secure the elbow connector to the wall junction box
cover with locknut. Place and mount the wall junction box with
the four wall mounting screws making sure to pass the wall lines
through the junction box. Connect and join all wall lines with the
stripped ends using wire nuts. Tighten both screws of the wall
junction box cover to junction box.
6.
Follow steps 4-6 on page 19 and refer to Figure 27.
TO CHASSIS JUNCTION
4.0 IN.
18.0 IN.
EXPOSE
WIRES
(1.0 IN.)
STRIP WIRE ENDS (0.5 IN.)
TO WALL JUNCTION
FRP032
Figure 16
WALL CONNECTION
GROUND
WIRE
HARNESS
JUNCTION
BOX COVER
Figure 17
LEADING SIDE FOR
WIRE HARNESS INSERTION
SPACER
SPACER
BUSHING
CONDUIT
SLEEVE
EXITING SIDE FOR
WIRE HARNESS
STRAIGHT
CONNECTOR
JUNCTION
BOX
GROUND
SCREW
COVER
SCREWS
FRP033
LOCKNUT
CHASSIS
JUNCTION
BOX
CONDUIT
CONNECTOR
FRP034
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pde07r3sgPde09r3sgPde15r5sgPdh07r3sg

Table of Contents