Download Print this page

EcoSmart Fire ESF.1.F.650CV Clearances And Installation Manual page 4

Fireboxes

Advertisement

english
CV Firebox Inserts
Installation
Equipment required:
Power Drill, Screw Driver, Hand Trowel for Plaster, Silicone Gun, Caulk Gun
1. construct main wall framework leaving an opening as dimensioned in
table a.
2. Create an insulated cavity using 8mm [0.3in] fire
retardant cement boards fixed to the framework.
4. Add extra framing to secure fire-retardant sheeting.
www.ecosmartfire.com
table A: Framing dimensions
Physical model dimensions and thickness of cement boards should be verified against cut
out dimensions BEFORE installation begins to confirm tolerances align.
W
Model
mm [in]
712
650CV
[28]
782
720CV
[30.8]
982
920CV
[38.7]
1168
1100CV
[46]
1462
1400CV
[57.6]
3. Ensure the cavity frame is offset from the timber frame. The offset
distance must be the same as the wall panel (gyprock/dry wall thickness).
5. silicone all internal edges to make the cavity watertight.
d
H
mm [in]
mm [in]
278
506
[10.9]
[19.9]
318
669
[12.5]
[26.3]
318
669
[12.5]
[26.3]
331
746
[13]
[29.4]
331
746
[13]
[29.4]

Advertisement

loading