Installation And Operation; Unpacking And Inspection - Orvaldi V10KRT User Manual

Online ups
Table of Contents

Advertisement

2. Installation and Operation

We also offer optional parallel function for both models upon request. The UPS with parallel function is called
the "Parallel model". We have detail installation and operation procedure of the Parallel Model in the
following chapter.

2-1. Unpacking and Inspection

Unpack the package and check the package contents. The shipping package should contain:
● One UPS
● One user manual
● One monitoring software CD
● One RS-232 cable (option)
● One USB cable
● One parallel cable (only available for parallel model)
● One shared current cable (only available for parallel model)
NOTE: Before the installation, please inspect the unit. Be sure that there is no physical damage to the unit.
Do not turn on the unit and notify the carrier and dealer immediately if there is any damage or missing parts
and accessories. Please keep the original packaging for future use. It is recommended to keep each
equipment and battery set in their original packaging because they have been designed to provide maximum
protection during transportation and storage.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

V15krtV20krt

Table of Contents