Download Print this page

SRC BMW-310GS-04-01-AL Manual page 3

Top rack for bmw g 310 gs

Advertisement

Step 2:
The Bush is to be sandwiched
between the Top surface of the
Mounting Hole and the bottom
side of the Top Rack.
Slip in the M6 Nut from the
Bottom side and secure the
threads and tighten it to torque,
as specified in the BOM Table.
The final mounted condition of the Top
Rack is as shown in the drawing on the
right.
Copyright By SRC
Design and Specification are subjected to change
Step 1:
Step 1:
Orient and Align the Top Rack (1),
Washer M6 – 4 off (2), Screw M6 x 45 – 4
off (3), and place the Bush – 4 off (4), as
shown in the drawing, in-line with the
Mounting hole in the Motorbike
Page 3

Advertisement

loading

This manual is also suitable for:

Bmw-310gs-04-02-al