ELECTRICAL WIRING

11.4 ELECTRICAL WIRING CAPACITY

11.4.1 Field minimum wire sizes for power
source
Use an ELB (Earth Leakage Breaker). If not used, it will
Do not operate the system until all the check points have
Check to ensure that the electrical resistance is more
than 1 megohm, by measuring the resistance between
ground and the terminal of the electrical parts. If it is
less than 1 megohm, do not operate the system until the
electrical leakage is found and repaired.
Check to ensure that the stop valves of the outdoor unit
are fully opened, and then start the system.
Check to ensure that the switch on the main power
source has been ON for more than 12 hours, to warm the
compressor oil by the crankcase heater.
Do not touch any of the parts by hand at the discharge gas
side, since the compressor chamber and the pipes at the
discharge side are heated higher than 90ºC.

11.5 SETTINGS OF SWITCHES

Quantity and position of switches
SW504
SW503
C A U T I O N
22
PMML0515 rev.0 - 03/2019
SW501
SW502
N O T E
Model
Power source
RAI-60RPE
SW501
SW504
ON
1 2 3 4 5 6
N O T E
Power
Transmitting
source
cable size
cable size
IEC 60335-1
IEC 60335-1
2
2
SW503
SW502