General Installation - U-Line UONP115SS01B Quick Start Manual

Hide thumbs Also See for UONP115SS01B:
Table of Contents

Advertisement

QUICK START GUIDE
Install top hinge and door:
Top Hinge
Left Side
1.
Remove pivot screw from hinge, flip hinge over, and
install the pivot screw in the same hole from the
opposite surface.
2.
Rotate door 180 degrees and position door onto
bottom hinge.
3.
Align long edge of the hinge with the outer edge of the
unit.
4.
Tighten three screws and replace hinge cover.
5.
Replace hinge cover.
Align and adjust the door:
Align and adjust the door (see DOOR ALIGNMENT AND
ADJUSTMENT)
Top Hinge
Right Side
Pivot
Screw

General Installation

LEVELING INFORMATION
1.
Use a level to
confirm the unit is
level. Level should
be placed along top
edge and side edge
as shown.
2.
If the unit is not
level, adjust the legs
on the corners of the unit as necessary.
3.
Confirm the unit is level after each adjustment and
repeat the previous steps as needed.
INSTALLATION TIP
If the room floor is higher than the floor in the cutout
opening, adjust the rear legs to achieve a total unit rear
1⁄8
height of
" (3 mm) less than opening's rear height.
Shorten the unit height in the front by adjusting the front
legs. This allows the unit to be gently tipped into the
opening. Readjust the front legs to level the unit after it is
correctly positioned in the opening.
INSTALLATION
1.
Plug in the power/electrical cord.
2.
Gently push the unit into position. Be careful not
to entangle the cord or water and drain lines, if
applicable.
3.
Re-check the leveling, from front to back and side to
side. Make any necessary adjustments. The unit's top
surface should be approximately
countertop.
4.
Install the anti-tip bracket.
5.
Remove interior packing material and wipe out the
inside of the unit with a clean, water-dampened cloth.
22
1
Turn to Adjust
1⁄8
" (3 mm) below the

Advertisement

Table of Contents
loading

Table of Contents