Maintenance; Eu-Declaration - Redexim Verti-Drain 7516 Operator And Parts Manual

Table of Contents

Advertisement

Crankshaft problems
Rear roller shacking

13.0 MAINTENANCE

Pre-Delivery-Inspection
After first 20 hours
(new or repaired)
After every 100 hours

14.0 EU-Declaration

We, Redexim Utrechtseweg 127 3702 AC Zeist Holland, hereby declare fully on our authority that
the product:
VERTI-DRAIN 7516, WITH MACHINE NUMBER AS INDICATED ON THE MACHINE AND
IN THIS MANUAL,
to which this declaration applies, has been manufactured in line with NEN-EN 12100-1,
NEN 12100-2 and NEN-EN 294, according to the stipulations of: The Machine Directive 98/37/EG.
A.C. Bos
Manager Opertions and Logistics
Redexim Holland
Big end nuts slacken
Rear roller locked
Rear roller up with hollow coring
Tough circumstances
Grease crankshaft bearings
Check bolts/ nuts
Connect the unit to a tractor
Run unit for 5 min
Grease crankshaft bearings
Grease PTO and rollers
Check bolts/nuts
Look closely at machine
Grease crankshaft bearings
Grease PTO and rollers
Check bolts/ nuts
Look closely at machine
Grease spindles front roller
.
Solve vibration, see vibration.
Crankshaft bearing collapsed.
Incorrect assembled after repair.
Remove, clean, use loctite.
Unlock.
Change speed and PTO rev's.
Put roller free on the ground.
Change machine settings.
8 shots each EP 2
See instructions in this manual
Look and listen
4 shots each EP 2
4 shots each EP 2
6 shots each EP 2
4 shots each EP 2
15

Advertisement

Table of Contents
loading

Table of Contents