Download Print this page

Delta Ecodrip Series Care And Operation Instructions Manual page 5

Filter/drip system

Advertisement

Project : _________________________________
Owner: __________________________________
Location: ________________________________
Soil type: ________________________________
Soil Group: _______________________________
Soil Loading Rate: __________________________
Disposal Area Size __________ GPD ÷ __________ Loading Rate = _________ Sq. Ft.
Total Drip Line (2' Lateral Space) _________ Sq Ft ÷ 2 = __________ L/Ft
Example using Geoflow
Classic Drip Tubing:
®
Maximum Drip Line Per Zone 630 Linear Feet – 8115-1/2 HP, 115 Volt Pump
Maximum Drip Line Per Zone 1500 Linear Feet – 8230-1 HP, 230 Volt Pump
Emitter Flow Rate 1.22 GPH Nominal
Dosing Pump Capacity 6.4 GPM – 8115-1/2 HP, 115 Volt Pump
Dosing Pump Capacity 15.25 GPM – 8230-1 HP, 230 Volt Pump
________________ L/Ft (drip line required) ÷ 630 (max. per zone) = _______________ # zones
1/2 HP
________________ L/Ft (drip line required) ÷ 1500 (max. per zone) = _______________ # zones
1 HP
*Round up to the next whole number; if more than one zone they should be equal. Maximum 4 zones.
Site Slope _________%
Refer to Drip Tubing Chart (Table 1) in this manual for standard Drip Tubing
zones, Consult Delta Treatment Systems for optional zone sizing.
DRIP SYSTEM DESIGN
Date: ____________________________________
Phone: ___________________________________
County: __________________________________
Soil Texture: _______________________________
Depth for Optimum Use: ______________________
Projected Daily Flow: _________________________
When slopes of 20% or greater are encountered use three (3) ft.
minimum lateral spacing
5

Advertisement

loading

This manual is also suitable for:

811582308115-1/2hp8230-1hp