Download Print this page

Advertisement

Quick Links

General Instructions
OVERLAP APEX SHED 10X8 & 12X8
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
Screws & Nails
Measure
overall
length
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Bolts
To identify the xings
Measure
required for each step use a
under the
measuring tape.
head
PLEASE SCAN HERE:

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01OVLPA08DDGP-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01OVLPA08DDGP-V1

  • Page 1 For assistance please contact customer care on: 01636 821215 TYPES OF BASE Mercia Garden Products Limited, - Concrete 75mm laid on top of 75mm hard-core. Sutton On Trent, - Slabs laid on 50mm of sharp sand.
  • Page 2 01OVLPA08DDGP-V1 Please retain product label and instructions for future reference 10 x 8 ft Felt Overall Dimensions: Length = 3028mm Width = 2482mm 10x8ft NO WINDOWS 10x8ft FIXED WINDOW Height = 2118mm T Hinge QTY 4 Finial QTY 2 Base Dimensions:...
  • Page 3 Please retain product label and instructions for future reference Contents for packs to create a 10x8 shed Building Content - 10X8 Pack B With Window : Building Content - 10X8 Pack C No Window : With WIndow Pack - 01OVLPA0508FWPB-V1 No WIndow Pack - 01OVLPA0508NWPC-V1 Plain Side QTY 2 Window Panel QTY 2...
  • Page 4 Please retain product label and instructions for future reference Contents for packs to create a 12x8 shed Building Content - 12X8 Pack B With Windows : Building Content - 12X8 Pack C No Windows : With Window Pack - 01OVLPA0608FWPB-V1 No Window Pack - 01OVLPA0608NWPC-V1 Plain Side QTY 4 Floor QTY 4...
  • Page 5: Pre-Assembly

    Please retain product label and instructions for future reference Step 2 Pre Assembly IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 2 QTY 1 Remove transportation blocks Lay the Front Gable Left (No. 2) from the bottom of each panel before beginning assembly.
  • Page 6 Please retain product label and instructions for future reference Step 5 IMPORTANT : Pre-drill before xing screws. Step 4 IMPORTANT : Pre-drill before xing screws. Parts Needed 10x8 - No. 26 QTY 2 Parts Needed - No. 4 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 6 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Step 7 Parts Needed 10x8 - No. 24 QTY 1 Parts Needed 10x8 - No. 24 QTY 1 (No Window QTY 2) Parts Needed 12x8 - No.
  • Page 8 Please retain product label and instructions for future reference Step 8 Step 9 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed 10x8 - No. 24 QTY 1 (No Windows QTY 2) No. 25 QTY 1 (Fixed Window ONLY) Fix the Door Gable (please refer to steps 1 Parts Needed 12x8 - No.
  • Page 9 Please retain product label and instructions for future reference Step 11 Step 12 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. 10 x 8 Parts Needed - No. 6 QTY 2 Parts Needed 10x8 - No. 22 QTY 2 No.
  • Page 10 Please retain product label and instructions for future reference Step 13 Step 14 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 7 QTY 6 Parts Needed - No. 9 QTY 6 Position a Truss Frame (No. 7) to the Position the truss block (No.9) ridge bar (No.
  • Page 11 Please retain product label and instructions for future reference Step 16 Step 15 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed 10x8 - No. 27 QTY 8 Parts Needed - No. 8 QTY 3 Parts Needed 12x8 - No.
  • Page 12 Please retain product label and instructions for future reference Step 17 IMPORTANT : Pre-drill before xing screws. Step 18 IMPORTANT : Pre-drill before xing screws. Parts Needed 10x8 - No. 31 QTY 8 Parts Needed 12x8 - No. 39 QTY 4 Once the roof is fully xed, attach the panels to the...
  • Page 13 Please retain product label and instructions for future reference Step 19 IMPORTANT : Pre-drill before xing screws. Step 20 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 20 Parts Needed - No. 14 QTY 6 Using the felt (No. 20), cut out three Using a pencil and a stright edge, measure the Strip (No.14) to 1575mm.
  • Page 14 Please retain product label and instructions for future reference Step 21 IMPORTANT : Pre-drill before xing screws. Step 22 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 13 QTY 1 Parts Needed - No. 15 QTY 1 Locate the cover trim (No. 13) on Using a pencil and a straight edge, the back of the shed so it covers measure the Strip (No.15) to create...
  • Page 15 Please retain product label and instructions for future reference Step 23 Step 24 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 12 QTY 4 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 10 QTY 2 No. 19 QTY 2 No.
  • Page 16 Please retain product label and instructions for future reference Step 25 Step 26 (Fixed Window only) IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 11 QTY 1 Parts Needed - No. 29 QTY 1 No.
  • Page 17 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. Step 27 (Fixed Window only) Step 28 (Fixed Window only) Parts Needed - No. 32 QTY 2 Parts Needed - No. 29 QTY 1 No. 34 QTY 4 No.
  • Page 19 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...